Environmental Impact Assessment for a frog breeding land based facility, in Mandraki – Achladeri, Evia Island, Central Greece.
(Client: ZARGANIS S.A.)
Specific Ecological Evaluation Study for a fotovoltaic park in Kalamia area, Larisa, Thessalia, Central Greece
(Client: BIOKARPET S.A.)

Environmental Impact Assessment Study for the construction and operation of two (2) Solar Photovoltaic Power Plants and a Step-up Substation sited at Dormani, near Koumaria village, in the Municipality of Veria, Regional Unit of Imathia, Region of Central Macedonia with a footprint in total area of 2.317.071,58 sq.m. and with a total capacity of 39,976 MW.

(Client: EGNATIA S.A.)

Environmental Impact Assessment Study for the construction and operation of one (1) Solar Photovoltaic Power Plant sited at Rhodia, near Rhodia village, in the Municipality of Tyrnavos, Regional Unit of Larissa, Region of Thessaly with a footprint in total area of 329.704,71 sq.m. and with a total capacity of 19,965 MW.

(Client: EGNATIA S.A.)

Environmental Impact Assessment Study for the construction and operation of six (6) Solar Photovoltaic Power Plants sited at Xirolakkos, near Vafiohori village, in the Municipality of Paionia, Regional Unit of Kilkis, Region of Central Macedonia with a footprint in total area of 1.134.413,75 sq.m. and with a total capacity of 49,980 MW.

(Client: EGNATIA S.A.)

Environmental Impact Assessment Study for the construction and operation of four (4) Solar Photovoltaic Power Plants sited at Rachia 1, near Rachis village / Rachia 2, 3 & 4 near Georgianoi settlement, in the Municipality of Veria, Regional Unit of Imathia, Region of Central Macedonia with a footprint in total area of 950.915,67 sq.m. and with a total capacity of 29,478 MW.

(Client: EGNATIA S.A.)